Politics
Egypt's transport minister outlines conversion of 2,000 km of railway signals to electronic operation
Coverage
3 reports · over 4 hours
Egypt's transport minister presented a plan to convert 2,000 km of main-line railway signals to electronic operation, and the railway authority resumed Cairo–Aswan service.
- Transport Minister Kamel El-Wazir told parliament's transport committee that signals on 2,000 km of main lines are being converted to electronic systems.
- El-Wazir said the 208 km Cairo–Alexandria line is 100% complete and the 214 km Benha–Port Said line is 99.8% complete.
- On the 883 km Cairo–Aswan line, the Beni Suef–Assiut and Assiut–Nag Hammadi sections are complete, and Nag Hammadi–Luxor is 76% complete.
- A National Railway Authority source said about 18 km of track is being renewed in Tamwa and Abu al-Numrus, with signal work continuing at Boulaq al-Dakrour.

